Bathroom tile progressing

 The drywall is now taped and sanding will be tomorrow, The shower niche is drying and back shower wall partly done They wanted to have had more done but the niche too too long. Today the plan is most of the tiling done. Tiling above the sink will have to wait till the cabinet and the sink is installed. though.