Tuesday, January 24, 2012

Bathroom sink

The plumber was here all day putting in the toilet, sink, vanity, recycle pump and shower stuff. The recycle pump took longest. It is a gadget Gary wanted that will reticulated the water in the line until it is at a preset temp. Since we have hot water on demand and no water heater(tank) it takes a bit to get hot water. So he had this pump installed. There also was a toilet leak and he had to reset toilet after redoing a valve. No tile work done as the other guys could not work in there at same time so they painted the door and molding and will be back tomorrow along with the electrician.
The walls are still yellower than I wanted but for now...it will do. The lighting will change it again I think. At least all is pretty neutral.
and yes...
  we will take the sticker off the toilet. It is a dual flush BTW. A short flush or longer for those longer bathroom times..LOL.


1 comment:

Anonymous said...

Wow it looks really nice. I bet you cant wait to get naked in there!!(^_^)
Sandi