Thursday, January 19, 2012

Bathroom tiling continues

There is only the lower part of the shower to tile. They did get the floor done and the upper part of the walls.

They also lowerd the shower threshold by a couple inches. Making a smaller step-over to get into the shower. The floor shower system was default 5" and i was fitted out to be 3" including tile.

I was a bit wrong on when they would tile above the sink. They hope to do it tomorrow before the vanity and sink is installed. They better have good measurements..LOL.




1 comment:

Sandi said...

Wow, it looks really nice. I bet you can hardly wait to have it done. It is very pretty what I can see of it.
Sandi